- Client:
- Location:
- Date:
- Duration:
- Tags:
PETRONAS RAPID14-1200 RAPID, PENGERANG
Construction and Commissioning (CC) Of 33kV And Below Distribution Substation Feeder, Cable Laying, Jointing and Termination at Gas Insulated Substation (GIS)
Construction and Commissioning (CC) Of 33kV And Below Distribution Substation Feeder, Cable Laying, Jointing and Termination at Gas Insulated Substation (GIS)